The build incorporates HBS technology and sleek SYNC Industries bathroom Pods, built off-site before being transported onsite for installation. Prefabrication decreased the construction timeline and fast-tracked the project, whilst at the same time minimising material and energy waste.
For this unique project, Hickory also created a number of bespoke pieces in their manufacturing facility in Laverton North. This included an architectural concrete bookshelf in the lobby, and minibar kitchenettes that were fitted out in each room.
https://www.hotelmanagement.com.au/2021/04/30/ovolo-south-yarra-hosts-rockstar-party-for-opening/