Hickory Building Systems.

Our uniquely integrated project solution allows
Hickory to deliver projects that consistently out
perform on measures of time, cost,
sustainability and quality. 

From foundation
to final completion.

About.

Hickory’s patented building technology delivers an innovative, technological alternative to the construction of high-rise projects.
Our Integrated Structural System accelerates construction programs by up to 50%, minimising material and energy waste, whilst maximising quality and safety. We blend the best of manufacturing and construction technology, processes and personnel with Hickory's self-performance capabilities to deliver our clients a turn-key building solution.

Integrated Project Delivery.

As an established construction company with extensive self perform capabilities and over 25 years experience in building major projects, Hickory is able to offer a complete turn-key construction solution using the combined resources of our manufacturing and construction divisions. 

Streamlined Design & Engineering

The Hickory System is a state of the art structural system that integrates the core, shear walls, bathrooms and facade of a building into a unified structure which is built ex-situ and in parallel with on-site works.

Architectural Freedom

Using a series of predesigned, interchangeable componentry, the System can be scaled from medium rise to high-rise and from large to small aspect ratio as required - translating system flexibility into cost efficiency.

Cost Savings

Applying the upfront design and procurement of a manufacturing model to the construction process enables accurate costing of materials whilst significantly minimising preliminary, variation and financing costs & fast-tracking IRR.

Sustainable

Independent research demonstrates the Hickory System offers a more sustainable construction solution, utilising less carbon intensive materials and reducing waste, energy and water usage throughout the build process.

Faster Construction

By creating a parallel construction program and eliminating the risk of weather delays, Hickory Building Systems projects can be delivered up to 50% faster than traditional construction methods allow.

Safe

Because Hickory Systems structures arrive to site with finished façades, we eliminate the risk of falls and remove the need for work on the building edge, creating a safer environment for workers and the community alike.

System Capabilities.

The building process begins with an engineered concrete floor, load bearing columns, fully fitted wet areas and a building façade.  Once assembled on site the integrated system locks together, offering exceptional structural stability and enabling fit-out to quickly progress behind the protection of the pre-attached façade. 

Projects.

La Trobe Tower

Prefabricated Building

Record setting project becomes Australia's tallest prefabricated building by using innovative Hickory delivery model 

View Project

La Trobe Street Student Accommodation

Prefabricated Building

Student Accommodation tower fosters sense of community and pioneers innovative delivery model

View Project

Collins House

Prefabricated Building

Redevelopment of historic city site uses modern Hickory building method to gain time and height advantages

View Project

Peppers Kings Square

Prefabricated Building

17 storey Perth hotel project utilises innovative Hickory delivery model to fast-track construction

View Project

Contact Us.

To stay informed about Hickory Building Systems
projects please fill in your details.