"The project has highlighted that prefab is particularly useful on a small footprint sites with limited access, where the logistics of delivering materials and equipment on site can be particularly challenging," the company says.
With a street frontage of just 11.5 metres and a footprint of 480sqm, the 60-level building designed by Bates Smart and developed by Golden Age and Deague Group posed a number of challenges.